2025-11-12 17:50:44 +01:00
|
|
|
# TODO - spotlight.cam
|
|
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
**Active tasks and roadmap**
|
2025-11-12 18:07:42 +01:00
|
|
|
|
|
|
|
|
---
|
|
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
## Current Status
|
2025-11-12 17:50:44 +01:00
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
**Phase:** MVP Complete - Ready for Production Deployment
|
|
|
|
|
**Tests:** 286/286 passing (73% coverage)
|
|
|
|
|
**Status:** Awaiting infrastructure setup
|
2025-11-12 18:07:42 +01:00
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
### Recently Completed (2025-11-23)
|
|
|
|
|
- Recording Matching System (auto-assign recorders for heats)
|
|
|
|
|
- Competitor Number (Bib) Support
|
|
|
|
|
- Frontend Refactoring (component extraction, status constants)
|
|
|
|
|
- Dashboard with real-time updates (online count, unread messages)
|
2025-11-20 00:05:24 +01:00
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
**Full history:** See `docs/archive/COMPLETED.md`
|
2025-11-20 23:02:59 +01:00
|
|
|
|
|
|
|
|
---
|
|
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
## Security Audit Findings
|
2025-11-20 00:05:24 +01:00
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
### Critical Issues (Must Fix Before Production)
|
2025-11-20 00:05:24 +01:00
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
| Issue | Severity | File | Action |
|
|
|
|
|
|-------|----------|------|--------|
|
|
|
|
|
| AWS Credentials in Git | 10/10 | `.env.production` | Rotate & remove from history |
|
|
|
|
|
| Weak JWT Secret | 9/10 | `.env.production` | Generate 64+ byte secret |
|
|
|
|
|
| Default DB Password | 8/10 | `docker-compose.yml` | Remove default fallback |
|
2025-11-20 00:05:24 +01:00
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
### High Priority Issues
|
2025-11-12 18:07:42 +01:00
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
| Issue | Severity | Action |
|
|
|
|
|
|-------|----------|--------|
|
|
|
|
|
| Missing HTTPS/TLS | 8/10 | Configure SSL certificate |
|
|
|
|
|
| Missing nginx security headers | 6/10 | Add X-Frame-Options, CSP, etc. |
|
|
|
|
|
| Dependency vulnerabilities | HIGH | Run `npm audit fix` |
|
|
|
|
|
| Excessive body size (500M) | 4/10 | Reduce to 10M |
|
2025-11-12 18:07:42 +01:00
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
### Positive Security Findings
|
|
|
|
|
- Strong authentication (JWT, bcrypt, email verification)
|
|
|
|
|
- Input validation (express-validator)
|
|
|
|
|
- Security headers (Helmet.js)
|
|
|
|
|
- Rate limiting implemented
|
|
|
|
|
- CORS configured
|
|
|
|
|
- SQL injection prevention (Prisma)
|
|
|
|
|
- Account lockout implemented
|
|
|
|
|
- WebRTC P2P (videos don't touch server)
|
2025-11-14 15:21:00 +01:00
|
|
|
|
|
|
|
|
---
|
|
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
## Pre-Deployment Checklist
|
2025-11-20 22:30:18 +01:00
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
- [ ] Rotate AWS credentials, remove from Git history
|
|
|
|
|
- [ ] Generate strong JWT_SECRET (64+ bytes)
|
|
|
|
|
- [ ] Set strong PostgreSQL password
|
|
|
|
|
- [ ] Configure HTTPS/TLS
|
|
|
|
|
- [ ] Add nginx security headers
|
|
|
|
|
- [ ] Run npm audit fix
|
|
|
|
|
- [ ] Reduce nginx body size limit
|
2025-11-12 18:07:42 +01:00
|
|
|
|
|
|
|
|
---
|
|
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
## Future Improvements (Optional)
|
2025-11-12 17:50:44 +01:00
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
### UX Enhancements
|
|
|
|
|
- Activity Feed (timeline of user activities)
|
|
|
|
|
- Smart sort order (unread first, pending ratings)
|
|
|
|
|
- User statistics (total matches, average rating)
|
|
|
|
|
- Sidebar filters (by nationality, division)
|
docs: mark Phase 3 (MVP Finalization) as completed
Update project status to reflect completion of all MVP features:
Phase 3 achievements:
- ✅ Security hardening (CSRF, rate limiting, account lockout)
- ✅ All tests passing (223/223, 71% coverage)
- ✅ PWA features (manifest, service worker, iOS support)
- ✅ Production deployment preparation
- ✅ Operations scripts (backup, restore, health-check)
- ✅ Monitoring documentation
Status: 100% MVP complete, ready for production deployment
Next: Infrastructure setup (server, domain, SSL)
2025-11-20 22:24:35 +01:00
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
### Security Hardening
|
|
|
|
|
- Increase bcrypt rounds (10 → 12)
|
|
|
|
|
- Implement refresh token pattern
|
|
|
|
|
- Add Socket.IO rate limiting
|
|
|
|
|
- Sanitize chat messages
|
2025-11-12 17:50:44 +01:00
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
### Infrastructure
|
|
|
|
|
- CI/CD pipeline (GitHub Actions)
|
|
|
|
|
- E2E tests (Playwright)
|
|
|
|
|
- Security logging
|
2025-11-12 17:50:44 +01:00
|
|
|
|
|
|
|
|
---
|
|
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
## Progress Summary
|
2025-11-12 17:50:44 +01:00
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
| Phase | Status | Time |
|
|
|
|
|
|-------|--------|------|
|
|
|
|
|
| Phase 0: Frontend Mockup | ✅ Done | ~8h |
|
|
|
|
|
| Phase 1: Backend Foundation | ✅ Done | ~14h |
|
|
|
|
|
| Phase 1.5: Email & WSDC & Profiles | ✅ Done | ~12h |
|
|
|
|
|
| Phase 1.6: Competition Heats | ✅ Done | ~8h |
|
|
|
|
|
| Phase 2: Matches & Ratings | ✅ Done | ~10h |
|
|
|
|
|
| Phase 2.5: WebRTC P2P | ✅ Done | ~10h |
|
|
|
|
|
| Phase 3: MVP Finalization | ✅ Done | ~20h |
|
|
|
|
|
| **Total MVP** | **✅ Complete** | **~82h** |
|
2025-11-12 18:07:42 +01:00
|
|
|
|
|
|
|
|
---
|
|
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
## Quick Commands
|
2025-11-12 18:07:42 +01:00
|
|
|
|
|
|
|
|
```bash
|
2025-11-23 23:09:30 +01:00
|
|
|
# Development
|
2025-11-12 18:07:42 +01:00
|
|
|
docker compose up --build
|
2025-11-12 17:50:44 +01:00
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
# Tests
|
|
|
|
|
docker compose exec backend npm test
|
2025-11-12 17:50:44 +01:00
|
|
|
|
2025-11-23 23:09:30 +01:00
|
|
|
# Access
|
|
|
|
|
http://localhost:8080
|
2025-11-12 18:07:42 +01:00
|
|
|
```
|
2025-11-12 17:50:44 +01:00
|
|
|
|
|
|
|
|
---
|
|
|
|
|
|
2025-11-23 23:05:23 +01:00
|
|
|
**Last Updated:** 2025-11-23
|
2025-11-23 23:09:30 +01:00
|
|
|
**Full Details:** See `docs/archive/COMPLETED.md` for implementation details
|