From 3c116bf7968562afbaa1eeb6ab192e31ef80d416 Mon Sep 17 00:00:00 2001 From: =?UTF-8?q?Rados=C5=82aw=20Gierwia=C5=82o?= Date: Tue, 9 Dec 2025 19:25:52 +0100 Subject: [PATCH] docs: update documentation with Phase 3.8 fixes and production warnings --- README.md | 44 ++++++++++++++++++++++++-- docs/SESSION_CONTEXT.md | 50 +++++++++++++++++++++++++++++- docs/TODO.md | 37 +++++++++++++++++++--- docs/archive/COMPLETED.md | 65 +++++++++++++++++++++++++++++++++++++++ 4 files changed, 188 insertions(+), 8 deletions(-) diff --git a/README.md b/README.md index b8e3fb8..acd6f8b 100644 --- a/README.md +++ b/README.md @@ -24,22 +24,26 @@ Web application (PWA) enabling dance event participants to: - Password reset workflow - Real-time username/email availability validation (debounced API calls, visual feedback) - Enhanced password validation with visual requirement indicators -- WSDC integration (auto-fill profile data from worldsdc.com) +- WSDC integration (auto-fill profile data from worldsdc.com, string ID support) +- Polish character support in first/last name validation (ąćęłńóśźż) - Event slugs (alphanumeric IDs preventing enumeration attacks) - Cloudflare Turnstile CAPTCHA (bot protection on registration & contact form) - Security: CORS, CSRF, Helmet.js, rate limiting, account lockout - Trust proxy for correct client IP detection behind nginx +- Session persistence with accountTier and isAdmin flags ### Events & Chat - Event list from worldsdc.com - Real-time event chat (Socket.IO) with active users sidebar - Real-time active users list (instant updates when users join/leave) +- Private 1:1 match chat with automatic room reconnection - Infinite scroll message history - Clickable usernames (/@{username}) with country flags - Competitor numbers (bib numbers) display - Message validation: 2000 character limit with visual counter - Spam protection: rate limiting (10 msg/min), duplicate detection, profanity filter - Polish + English profanity filtering +- Mobile-optimized scroll behavior (no page jump on new messages) ### Auto-matching & Fairness System - Smart recording assignment for competition heats @@ -484,5 +488,39 @@ TBD --- -**Status:** MVP Complete ✅ | 351/351 tests passing (100%) | Production Ready -**Last Updated:** 2025-12-06 +**Status:** ✅ **LIVE IN PRODUCTION** | 351/351 tests passing (100%) +**Last Updated:** 2025-12-09 +**Production URL:** [spotlight.cam](https://spotlight.cam) + +--- + +## ⚠️ Production Notice + +**This application is now running in production with real users and data.** + +### Development Guidelines for Production Environment + +1. **Database Migrations** + - ⚠️ **NEVER** run destructive migrations without backup + - Test all schema changes in development first + - Use Prisma migration preview: `npx prisma migrate dev --create-only` + - Review generated SQL before applying to production + - Always backup production database before schema changes + +2. **Data Safety** + - Production database contains real user data + - Test data operations in development environment first + - Use transactions for multi-step operations + - Implement rollback procedures for critical changes + +3. **Deployment Process** + - Test thoroughly in development before pushing + - Run full test suite: `make test` + - Review all changes: `git diff origin/master` + - Deploy during low-traffic periods when possible + - Monitor logs after deployment: `docker compose logs -f` + +4. **Emergency Procedures** + - Keep previous Docker images for quick rollback + - Document all production changes + - Have database backup ready before major updates diff --git a/docs/SESSION_CONTEXT.md b/docs/SESSION_CONTEXT.md index da793bb..6066ae8 100644 --- a/docs/SESSION_CONTEXT.md +++ b/docs/SESSION_CONTEXT.md @@ -348,4 +348,52 @@ REST_BUFFER_MINUTES: 60 --- -**Last Updated:** 2025-12-06 +**Last Updated:** 2025-12-09 + +--- + +## ⚠️ PRODUCTION ENVIRONMENT + +**Status:** ✅ **LIVE IN PRODUCTION** +**URL:** https://spotlight.cam +**Deployed:** 2025-12-09 +**Users:** Real users with real data + +### Critical Development Guidelines + +#### Database Safety +- ⚠️ **NEVER** run migrations without testing in development first +- Always backup production database before schema changes +- Use `npx prisma migrate dev --create-only` to preview SQL +- Test data operations in dev environment before production +- Use transactions for multi-step operations + +#### Deployment Process +1. Test thoroughly in development (`docker compose --profile dev up`) +2. Run full test suite (`make test` - all 351 tests must pass) +3. Review changes: `git diff origin/master` +4. Deploy during low-traffic periods +5. Monitor logs after deployment: `docker compose logs -f backend-prod` + +#### Emergency Rollback +- Keep previous Docker images: `docker images | grep app-` +- Rollback command: `docker compose --profile prod down && docker tag OLD_IMAGE NEW_IMAGE && docker compose --profile prod up -d` +- Have database backup ready at all times + +#### What to NEVER Do +- ❌ Drop tables or columns without migration plan +- ❌ Change primary keys or foreign key relationships +- ❌ Deploy without running tests +- ❌ Push directly to master without review +- ❌ Test experimental features on production data + +#### Recent Bug Fixes (Phase 3.8 - Dec 2025) +1. Admin dropdown persistence (session fields) +2. Mobile chat scroll behavior +3. Polish characters in name validation +4. WSDC ID type conversion +5. Match chat message display +6. Socket.IO reconnection handling +7. Docker production build scripts + +All fixes deployed successfully with zero downtime. diff --git a/docs/TODO.md b/docs/TODO.md index cf6798d..f0306df 100644 --- a/docs/TODO.md +++ b/docs/TODO.md @@ -6,20 +6,49 @@ ## Current Status -**Phase:** MVP Complete - Production Ready (Phase 3.6) +**Phase:** ✅ **LIVE IN PRODUCTION** (Phase 3.8 Complete) +**Production URL:** https://spotlight.cam **Tests:** 351/351 passing - 100% ✅ (73% coverage) +**Last Deployment:** 2025-12-09 **Recent Work:** +- 2025-12-09: Bug fixes deployed to production (admin dropdown, mobile scroll, Polish chars, WSDC ID, chat fixes) +- 2025-12-06: Real-time username/email validation, socket reconnection fixes - 2025-12-05: Cloudflare TURN/STUN WebRTC integration, comprehensive testing (9 tests, 100% coverage) - 2025-12-05: Public pages (About Us, How It Works), responsive design fixes - 2025-12-05: Cloudflare Turnstile CAPTCHA (registration, contact form) -- 2025-12-05: Contact form with admin panel, 404 page with logging - 2025-12-02: Activity Log System with real-time streaming dashboard -- 2025-11-30: Matching runs audit, ratings & stats system, comprehensive test suite **Full implementation history:** See `docs/archive/COMPLETED.md` --- +## ⚠️ PRODUCTION ENVIRONMENT - CRITICAL WARNINGS + +**This application is now running with REAL USERS and REAL DATA.** + +###Before Making ANY Code Changes: + +1. **Database Migrations** ⚠️ + - NEVER run destructive migrations without backup + - Test all schema changes in development FIRST + - Preview SQL: `npx prisma migrate dev --create-only` + - Backup production DB before applying migrations + +2. **Deployment Safety** + - Run full test suite: `make test` (all 351 tests must pass) + - Test thoroughly in development environment + - Deploy during low-traffic periods + - Monitor logs after deployment: `docker compose logs -f` + +3. **Rollback Procedure** + - Keep previous Docker images for quick rollback + - Have database backup ready + - Document all production changes + +**See README.md "Production Notice" section for full guidelines.** + +--- + ## Activity Log System (Complete ✅) **Status:** Phase 8/8 Complete - Ready for Testing @@ -666,5 +695,5 @@ http://localhost:8080 --- -**Last Updated:** 2025-11-29 +**Last Updated:** 2025-12-09 **Full Details:** See `docs/archive/COMPLETED.md` for implementation details diff --git a/docs/archive/COMPLETED.md b/docs/archive/COMPLETED.md index 7260b55..c121d4e 100644 --- a/docs/archive/COMPLETED.md +++ b/docs/archive/COMPLETED.md @@ -4,6 +4,71 @@ --- +## ✅ Phase 3.8 - Production Stabilization & Bug Fixes (2025-12-06 to 2025-12-09) + +**Status:** ✅ **DEPLOYED TO PRODUCTION** +**Production URL:** https://spotlight.cam + +### 🔧 Bug Fixes + +1. **Admin Dropdown Persistence** (`3195ce3`) + - **Issue:** Admin dropdown disappeared after page refresh + - **Fix:** Added `accountTier` and `isAdmin` to `GET /api/users/me` response + - **Files:** `backend/src/routes/users.js`, `backend/src/__tests__/users.test.js` + +2. **Mobile Chat Scroll** (`b506df1`) + - **Issue:** Page jumped to top on new message (mobile) + - **Fix:** Changed from `scrollIntoView()` to direct container scroll + - **Files:** `frontend/src/pages/EventChatPage.jsx` + +3. **Polish Characters Support** (`d780b54`) + - **Issue:** Names with ąćęłńóśźż rejected by validator + - **Fix:** Updated regex to include Polish diacritics + - **Files:** `backend/src/middleware/validators.js` + +4. **WSDC ID Type Conversion** (`c6cea11`) + - **Issue:** Registration failed with WSDC ID (number vs string) + - **Fix:** Convert to string before Prisma save + - **Files:** `backend/src/controllers/auth.js` + +5. **Match Chat Message Display** (`1013d12`, `19700ff`, `c8de07a`) + - **Issue:** Sender couldn't see own messages in match chat + - **Fix:** Added nested user object to messages response + - **Files:** `backend/src/routes/matches.js` + +6. **Socket.IO Reconnection** (`a5a2c7a`, `c8de07a`) + - **Issue:** Match chat didn't work after reconnect + - **Fix:** Auto-rejoin room on reconnect event + - **Files:** `frontend/src/hooks/useMatchChat.js` + +7. **Docker Production Build** (`5db396e`) + - **Issue:** Production backend missing scripts directory + - **Fix:** Added scripts to Dockerfile.prod COPY + - **Files:** `backend/Dockerfile.prod` + +### ✨ Features + +8. **Real-time Validation** (`71d22cc`) + - Username/email availability check (debounced, visual feedback) + - **Files:** `frontend/src/pages/RegisterPage.jsx`, `backend/src/routes/public.js` + +### 📝 Documentation + +9. **Local Development Config** (`b0ca382`) + - Added `docker-compose.override.yml` support (gitignored) + - Added `.env.development.local` support (gitignored) + - Enables mobile testing without committing local IPs + +### 🚀 Production Status + +- **Deployed:** 2025-12-09 +- **Downtime:** None +- **Database Changes:** None +- **Breaking Changes:** None +- **Tests:** 351/351 passing (100%) + +--- + ## ✅ Phase 0: Frontend Mockup (COMPLETED) **Completed:** 2025-11-12