Commit Graph

5 Commits

Author SHA1 Message Date
Radosław Gierwiało
1463b83882 docs: add Phase 2.5 (WebRTC) and Phase 3 (MVP Finalization) to COMPLETED.md
Added comprehensive completion documentation for:

Phase 2.5 (WebRTC P2P File Transfer):
- WebRTC signaling implementation
- File transfer with 16KB chunking
- Tested up to 700MB files
- E2E encryption (DTLS)
- NAT traversal (STUN servers)
- 7 backend tests passing

Phase 3 (MVP Finalization):
- Security hardening (CSRF, rate limiting, account lockout)
- 223/223 tests passing (100%), 71% coverage
- PWA features (manifest, service worker, iOS support)
- Production Docker configs
- Operations scripts (backup, restore, health-check)
- Monitoring documentation

Updated Last Updated date to 2025-11-20
Added MVP completion status
2025-11-20 22:35:41 +01:00
Radosław Gierwiało
e9f181052c docs: update documentation to reflect Phase 2 completion
- Mark Phase 2 (Matches & Ratings API) as completed in all docs
- Add new Ratings & Reviews section to README
- Update roadmap and progress tracking (72% complete)
- Document all Phase 2 features and endpoints in COMPLETED.md
- Reorganize TODO.md for Phase 2.5 (WebRTC) as next priority
2025-11-14 22:53:54 +01:00
Radosław Gierwiało
61f504fa72 docs: update documentation for QR code check-in system 2025-11-14 14:43:33 +01:00
Radosław Gierwiało
4d7f814538 docs: update documentation after Phase 1 completion
Updated documentation to reflect completion of Phase 1 (Backend Foundation):

- SESSION_CONTEXT.md: Updated status to Phase 1 completed, ~50% progress
  - Added completed backend infrastructure details
  - Updated tech stack with actual versions
  - Added Phase 2 next steps (Matches API, Ratings, WebRTC)
  - Updated key files list with backend files
  - Added Prisma OpenSSL bug fix to known issues

- TODO.md: Marked Phase 1 as completed, Phase 2 as active
  - Moved Phase 1 steps to completed section with checkmarks
  - Added detailed Phase 2 tasks (4 steps: Matches API, Ratings API, WebRTC Signaling, WebRTC File Transfer)
  - Reorganized future phases (removed Phase 2 from future, renumbered)

- COMPLETED.md: Added comprehensive Phase 1 completion record
  - All 4 steps documented with checkmarks
  - Test coverage statistics (81.19% overall)
  - Infrastructure updates
  - Bug fixes (OpenSSL for Prisma)
  - Git commit history for Phase 1
2025-11-12 22:51:11 +01:00
Radosław Gierwiało
a1357393e8 docs: optimize documentation structure for token efficiency
- Add SESSION_CONTEXT.md: ultra-compact context for new sessions (~500 lines)
- Add ARCHITECTURE.md: detailed technical specs and implementation details
- Add COMPLETED.md: archive of completed tasks (Phase 0)
- Add RESOURCES.md: learning resources and documentation links
- Refactor CONTEXT.md: keep only core project info and guidelines
- Refactor TODO.md: keep only active tasks and next steps
- Update README.md: reference new documentation structure

This change reduces token usage when resuming sessions by ~60% while maintaining complete project documentation in separate, well-organized files.
2025-11-12 18:07:42 +01:00