Files
spotlightcam/docs/TODO.md
Radosław Gierwiało 0d083dcb22 docs: optimize documentation for token efficiency
- SESSION_CONTEXT.md: 485 → 132 lines (-73%)
  - Remove outdated "Next Steps" sections
  - Remove detailed file listings
  - Keep only essential quick-reference info

- TODO.md: 917 → 118 lines (-87%)
  - Move detailed phase descriptions to COMPLETED.md
  - Keep security audit, checklist, future improvements
  - Remove redundant implementation details

- CONTEXT.md: Update test count to 286/286
2025-11-23 23:09:30 +01:00

119 lines
3.0 KiB
Markdown

# TODO - spotlight.cam
**Active tasks and roadmap**
---
## Current Status
**Phase:** MVP Complete - Ready for Production Deployment
**Tests:** 286/286 passing (73% coverage)
**Status:** Awaiting infrastructure setup
### Recently Completed (2025-11-23)
- Recording Matching System (auto-assign recorders for heats)
- Competitor Number (Bib) Support
- Frontend Refactoring (component extraction, status constants)
- Dashboard with real-time updates (online count, unread messages)
**Full history:** See `docs/archive/COMPLETED.md`
---
## Security Audit Findings
### Critical Issues (Must Fix Before Production)
| Issue | Severity | File | Action |
|-------|----------|------|--------|
| AWS Credentials in Git | 10/10 | `.env.production` | Rotate & remove from history |
| Weak JWT Secret | 9/10 | `.env.production` | Generate 64+ byte secret |
| Default DB Password | 8/10 | `docker-compose.yml` | Remove default fallback |
### High Priority Issues
| Issue | Severity | Action |
|-------|----------|--------|
| Missing HTTPS/TLS | 8/10 | Configure SSL certificate |
| Missing nginx security headers | 6/10 | Add X-Frame-Options, CSP, etc. |
| Dependency vulnerabilities | HIGH | Run `npm audit fix` |
| Excessive body size (500M) | 4/10 | Reduce to 10M |
### Positive Security Findings
- Strong authentication (JWT, bcrypt, email verification)
- Input validation (express-validator)
- Security headers (Helmet.js)
- Rate limiting implemented
- CORS configured
- SQL injection prevention (Prisma)
- Account lockout implemented
- WebRTC P2P (videos don't touch server)
---
## Pre-Deployment Checklist
- [ ] Rotate AWS credentials, remove from Git history
- [ ] Generate strong JWT_SECRET (64+ bytes)
- [ ] Set strong PostgreSQL password
- [ ] Configure HTTPS/TLS
- [ ] Add nginx security headers
- [ ] Run npm audit fix
- [ ] Reduce nginx body size limit
---
## Future Improvements (Optional)
### UX Enhancements
- Activity Feed (timeline of user activities)
- Smart sort order (unread first, pending ratings)
- User statistics (total matches, average rating)
- Sidebar filters (by nationality, division)
### Security Hardening
- Increase bcrypt rounds (10 → 12)
- Implement refresh token pattern
- Add Socket.IO rate limiting
- Sanitize chat messages
### Infrastructure
- CI/CD pipeline (GitHub Actions)
- E2E tests (Playwright)
- Security logging
---
## Progress Summary
| Phase | Status | Time |
|-------|--------|------|
| Phase 0: Frontend Mockup | ✅ Done | ~8h |
| Phase 1: Backend Foundation | ✅ Done | ~14h |
| Phase 1.5: Email & WSDC & Profiles | ✅ Done | ~12h |
| Phase 1.6: Competition Heats | ✅ Done | ~8h |
| Phase 2: Matches & Ratings | ✅ Done | ~10h |
| Phase 2.5: WebRTC P2P | ✅ Done | ~10h |
| Phase 3: MVP Finalization | ✅ Done | ~20h |
| **Total MVP** | **✅ Complete** | **~82h** |
---
## Quick Commands
```bash
# Development
docker compose up --build
# Tests
docker compose exec backend npm test
# Access
http://localhost:8080
```
---
**Last Updated:** 2025-11-23
**Full Details:** See `docs/archive/COMPLETED.md` for implementation details