Files
spotlightcam/docs/TODO.md
Radosław Gierwiało 0d083dcb22 docs: optimize documentation for token efficiency
- SESSION_CONTEXT.md: 485 → 132 lines (-73%)
  - Remove outdated "Next Steps" sections
  - Remove detailed file listings
  - Keep only essential quick-reference info

- TODO.md: 917 → 118 lines (-87%)
  - Move detailed phase descriptions to COMPLETED.md
  - Keep security audit, checklist, future improvements
  - Remove redundant implementation details

- CONTEXT.md: Update test count to 286/286
2025-11-23 23:09:30 +01:00

3.0 KiB

TODO - spotlight.cam

Active tasks and roadmap


Current Status

Phase: MVP Complete - Ready for Production Deployment Tests: 286/286 passing (73% coverage) Status: Awaiting infrastructure setup

Recently Completed (2025-11-23)

  • Recording Matching System (auto-assign recorders for heats)
  • Competitor Number (Bib) Support
  • Frontend Refactoring (component extraction, status constants)
  • Dashboard with real-time updates (online count, unread messages)

Full history: See docs/archive/COMPLETED.md


Security Audit Findings

Critical Issues (Must Fix Before Production)

Issue Severity File Action
AWS Credentials in Git 10/10 .env.production Rotate & remove from history
Weak JWT Secret 9/10 .env.production Generate 64+ byte secret
Default DB Password 8/10 docker-compose.yml Remove default fallback

High Priority Issues

Issue Severity Action
Missing HTTPS/TLS 8/10 Configure SSL certificate
Missing nginx security headers 6/10 Add X-Frame-Options, CSP, etc.
Dependency vulnerabilities HIGH Run npm audit fix
Excessive body size (500M) 4/10 Reduce to 10M

Positive Security Findings

  • Strong authentication (JWT, bcrypt, email verification)
  • Input validation (express-validator)
  • Security headers (Helmet.js)
  • Rate limiting implemented
  • CORS configured
  • SQL injection prevention (Prisma)
  • Account lockout implemented
  • WebRTC P2P (videos don't touch server)

Pre-Deployment Checklist

  • Rotate AWS credentials, remove from Git history
  • Generate strong JWT_SECRET (64+ bytes)
  • Set strong PostgreSQL password
  • Configure HTTPS/TLS
  • Add nginx security headers
  • Run npm audit fix
  • Reduce nginx body size limit

Future Improvements (Optional)

UX Enhancements

  • Activity Feed (timeline of user activities)
  • Smart sort order (unread first, pending ratings)
  • User statistics (total matches, average rating)
  • Sidebar filters (by nationality, division)

Security Hardening

  • Increase bcrypt rounds (10 → 12)
  • Implement refresh token pattern
  • Add Socket.IO rate limiting
  • Sanitize chat messages

Infrastructure

  • CI/CD pipeline (GitHub Actions)
  • E2E tests (Playwright)
  • Security logging

Progress Summary

Phase Status Time
Phase 0: Frontend Mockup Done ~8h
Phase 1: Backend Foundation Done ~14h
Phase 1.5: Email & WSDC & Profiles Done ~12h
Phase 1.6: Competition Heats Done ~8h
Phase 2: Matches & Ratings Done ~10h
Phase 2.5: WebRTC P2P Done ~10h
Phase 3: MVP Finalization Done ~20h
Total MVP Complete ~82h

Quick Commands

# Development
docker compose up --build

# Tests
docker compose exec backend npm test

# Access
http://localhost:8080

Last Updated: 2025-11-23 Full Details: See docs/archive/COMPLETED.md for implementation details